腾博会官网

NEWS CENTER

腾博会官网·专业效劳,诚信为本

NEWS

>

Project Information

Large-Scale Roofing Space Grid Structure Erected Successfully For GEELY Automotive Plant in Zhangjia

Time:2015-12-05

On Dec. 8th, 2015, the large-scale roofing space grid steel structure of GEELY Automotive plant in Zhangjiakou was successfully erected using jack lifting by JINGGONG STEEL.


 腾博会官网·专业效劳,诚信为本

Grid Structure of Assembly Workshop in Position


Located in Nanshan Economic development zone in Zhangjiakou, Henan, the total investment of Zhangjiakou GEELY Automotive Plant reached 5 billion Chinese Yuan, covering 148,500 square meters. The plant annual production capability of SC11 series vehicle will reach 120,000.


腾博会官网·专业效劳,诚信为本

Grid Structure of Welding Workshop in Position


It's worth mentioning that the space grid structure of this project reached 133,500 square meters, and all welding ball diagonal – square pyramid space grid, which made it very hard to erect with lots of welding work on site. Considering the structure form, erection height and other problems on site, JINGGONG STEEL Project Dept adopted the method of lifting after ground assembly. The steel structure weighed over 860t and covered over 18000 square meters by single jack lifting.

The construction method not only increased the quality and decreased the erection schedule, but also reduced cost of erection.


腾博会官网·专业效劳,诚信为本

Aerial View of Zhangjiakou GEELY Automotive Plant 

 



JINGGONG STEEL INTERNATIONAL

Dec 15, 2015


网站地图网站地图
友情链接:鸿运国际  腾博会官网  尊龙凯时  鸿运国际  yp街机  旋乐吧  云顶集团  bti体育  尊龙凯时  尊龙凯时  海洋之神  pp电子