腾博会官网

NEWS CENTER

腾博会官网·专业效劳,诚信为本

NEWS

>

Project Information

Steel Structure Closure of Xi'an Xianyang International Airport T3A

Time:2010-08-09

On Aug.6, the steel construction of Xi’an Xianyang International Airport T3A undertaken by JG Steel Domestic Division is completed. We have finished the steel construction in two months, and is highly praised by the clients.

The project adopts the cone shape tree like steel column supports, wave hyperboloid truss shape, and advanced purline supporting system. We adopt advanced hoisting technique by mobile tower crane moving on the floor, greatly increasing the efficiency and reducing the cost,which showcases the construction conception of “technical innovation and green power”.
 



JINGGONG STEEL INTERNATIONAL

Aug 9 ,2010


网站地图网站地图
友情链接:千赢国际  尊龙凯时  尊龙凯时  尊龙凯时  永乐国际  pp电子  k8凯发  南宫娱乐  bifa必发  凯时娱乐  新利体育luck18  腾博会官网